Make better use of materials, time and capacity.
When production costs are estimated after the job instead of tracked against it, the gap between plan and reality grows every cycle.
Business need
Use materials, time and capacity well
Capability
Planning, MRP, work orders, costing
Technology
Sage manufacturing technology
Execution
Production run on real material availability
Outcome
Visible job costs and capacity
Where the work is constrained
Production costs are estimated after the fact instead of tracked against the job
Bills of materials and work orders live outside the financial system
Material requirements planning happens on a whiteboard, not on live stock data
The capability required
Production Planning
MRP
Bills of Materials
Work Orders
Scheduling
Materials Management
Work-in-Progress
Production Costing
Capacity Planning
Quality Controls
The technology behind it
Sage provides the technology. Noviq configures it around how your production actually runs.
What changes in the operation
Costs estimated after the job
Production costing tracked against each work order
Bills of materials and work orders outside finance
Planning, materials and costing connected
Material planning on a whiteboard
MRP working from live stock
Production tied to the numbers that matter
Material consumption and job costs update as work happens, so the true cost of each job is visible, not estimated.
Evidence over claims
Client case study for Manufacturing & Production: coming soon
- The business situation
- The required capability
- The intervention
- The result
Accredited
Reseller Partner
Where could your operation perform better?
Noviq can help you find what needs to change and where technology can make a measurable difference.
Talk to Noviq